• Jiral@lemmy.org
    link
    fedilink
    arrow-up
    6
    ·
    edit-2
    11 hours ago

    The key question is if total costs along the pipeline, from requirements definition down to the final quality controlled fully debugged product can be reduced, at real LLM costs (not with the currently vastly subsidised costs).