Skeptics of the proposed hyperscale data center in Box Elder County are sweating about a lot more than its energy demands and potential toll on water supplies.
3,600 of those industrial-scale generators to power Stratos
Caterpillar 2.5mw generators have maximum efficiency of 45%, and so 19gw is peak thermal power. that is roughly 26 hiroshimas per day.
It’s an over estimate because datacenter cpu/gpu capacity utilization is on average under 10%. It could still produce all that power for export to trap all that heat in a valley.
17gw of heat is both under and over estimate.
Caterpillar 2.5mw generators have maximum efficiency of 45%, and so 19gw is peak thermal power. that is roughly 26 hiroshimas per day.
It’s an over estimate because datacenter cpu/gpu capacity utilization is on average under 10%. It could still produce all that power for export to trap all that heat in a valley.