• HamsterRage@lemmy.ca
    link
    fedilink
    arrow-up
    31
    ·
    14 hours ago

    If you read the article you’ll find out that the fibre piggybacks on the structures built for power transmission. And the power transmission has already been halted and is scheduled for dismantling.