• ohulancutash@feddit.uk
    link
    fedilink
    English
    arrow-up
    9
    ·
    edit-2
    2 days ago

    Well, if we’re cherrypicking, Paks plant in Hungary has reduced to 10% capacity because the Danube fell too low to get water in. The plant supplied half of the country’s energy. The military has dynamited the river bed to increase flow to the plant. 145,000 cubic metres of rock is arriving from this evening in a bid to alter the river flow, and two barges may be scuttled on Friday.