The hard mounting points, set in concrete for a large generator are to be 60 feet apart, per the manufacturer’s instructions. The construction company rounds 18.288m to 18m because “significant digits, oi!”
The mounting points are now 28 centimeters too close together. The generator shows up on site, and now needs to sit to the side for four days while the hard points are moved. Or, maybe longer, because concrete trucks need to be scheduled ahead of time. It could be two weeks.
Not so good for building things, eh?
The hard mounting points, set in concrete for a large generator are to be 60 feet apart, per the manufacturer’s instructions. The construction company rounds 18.288m to 18m because “significant digits, oi!”
The mounting points are now 28 centimeters too close together. The generator shows up on site, and now needs to sit to the side for four days while the hard points are moved. Or, maybe longer, because concrete trucks need to be scheduled ahead of time. It could be two weeks.
An engineer using DDG for units conversion should be procecuted for malpractice.