    I’m stunned anyone thinks this is going to happen just because the FCC authorized it.

    2025 saw 317 successful launches from every agency on Earth. SpaceX will need 16,667 perfect launches of 60 sats each. That’s over 50 years of launches if SpaceX had the entire planet’s 2025 launch capability.

    • very_well_lost@lemmy.world
      link
      fedilink
      English
      arrow-up
      2
      ·
      11 hours ago

      Even if they had the launch capacity, they’ll never raise the money for this.

      SpaceX sure as hell isn’t going to pay for a project of this scale out of its own pocket, and securing the loans for is going to be basically impossible. Data center debt is usually collateralized with the value of the GPUs, but GPUs are useless as collateral if they’re in fucking orbit where you can’t retrieve them.

      And SpaceX doesn’t really have much else to put up as collateral. Custom rocket parts, aerospace manufacturing infrastructure… that’s not really the sort of stuff a bank can resell, so it’s useless as collateral. The closest thing they seem to have to actual fungible assets is the 1000s of Cybertrucks they purchased to pump Tesla, but that fleet is only worth ~10 million at most and I doubt anyone would want to buy a used Cybertruck anyway.

    • Cocodapuf@lemmy.world
      link
      fedilink
      English
      arrow-up
      1
      ·
      edit-2
      9 hours ago

      That’s a really good point, a million satellites isn’t really feasible yet.

      It’s worth noting though, 60 sats per launch were the falcon 9 numbers, they’re not using that anymore, there are a limited number of flights left on their schedule. Going forward they’ll be relying on the starship, which has about 10x the capacity of the falcon 9. That said, the starlink v3 are also 4x heavier. So all together, expect about 150 satellites per launch.

      So going by that capacity per launch it would take 6667 launches, which is still safely in the realm of unrealistic.

    • Tanoh@lemmy.world
      link
      fedilink
      English
      arrow-up
      6
      ·
      23 hours ago

      Yeah, as far as I know the “authorization” is just “we have received your application and we will look at it.” It doesn’t mean they can just start launching shit tomorrow.

      And this will never happen anyway because of the laws of physics, but they will probably keep the grift going for long enough to cash out on the hype train.

    • Jiral@lemmy.world
      link
      fedilink
      English
      arrow-up
      2
      ·
      edit-2
      20 hours ago

      These things will be large, at least 4 times the heat disposal of the most powerful starlink satelites if I am not mistaken. I seriously doubt you could launch 30 of those at once.