• Lembot_0006@programming.dev
    link
    fedilink
    arrow-up
    2
    ·
    21 hours ago

    You expect a manager to be more competent in engineering than an engineer? You expect the manager to always expect a lie from an engineer and recheck any data received from the engineer?

    Well, we have very different ideas about how engineers and managers work.

    • ano_ba_to@sopuli.xyz
      link
      fedilink
      arrow-up
      8
      ·
      21 hours ago

      Technical managers exist. Yes, it’s a manager’s responsibility to understand the field he’s working in. He doesn’t need to be a more skilled engineer, but he needs to understand what his/her people are saying.

      • Lembot_0006@programming.dev
        link
        fedilink
        arrow-up
        1
        ·
        21 hours ago

        but he needs to understand what his/her people are saying.

        It isn’t enough to detect deliberate lies from an engineer like in this case.

        • ano_ba_to@sopuli.xyz
          link
          fedilink
          arrow-up
          3
          ·
          21 hours ago

          There are ways to know. Did the manager ask for proof of concept? Asked for performance tests of the update and compared it to existing/baseline?

            • ano_ba_to@sopuli.xyz
              link
              fedilink
              arrow-up
              2
              ·
              21 hours ago

              Of course don’t just ask the engineer. Any piece of code written by the engineer should ultimately be tested by a separate testing team before getting pushed to production. Ideally you have a performance and regression testing team that would help evaluate the changes being introduced and how it compares with the existing.