• Dead_or_Alive@lemmy.world
    link
    fedilink
    English
    arrow-up
    3
    ·
    2 hours ago

    No it’s gonna suck. Those data centers will consume fresh water and power driving up costs of both over the long term.

    The chips will also become obsolete or will degrade over time. After 7 years they will require replacement. Same is true with memory and ram.

    It’s never going to end.

      • MacGuffin94@lemmy.world
        link
        fedilink
        English
        arrow-up
        1
        ·
        2 hours ago

        Yes and no. Production capacity takes a long time to build up in manufacturing. Plus these are specialized parts so the build up will take longer. Don’t expect a significant production capacity increase in the US for 5-10 years.