Because the last time a Liberal PM built a pipeline it was too divisive and costly, this PM will checks notes do exactly the same thing again.
TMX 2: Electric Boogaloo!
Any bets on initial-final cost spread this time?
Because the last time a Liberal PM built a pipeline it was too divisive and costly, this PM will checks notes do exactly the same thing again.
TMX 2: Electric Boogaloo!
Any bets on initial-final cost spread this time?
How minimal was taxpayer funding to TMX on their last pipeline project? Where will the between $35.2 billion and $43.7 billion come from?
Yes, I’m fully aware of how much heavy lifting “should be” was doing - that’s why it was there.