    Yes, 100% true and also 100% irrelevant. The delta in NYC between base load and peak load is almost 5GW. And the base load itself is about 5GW. Given that peak loads happens only for 0.1% of the year, you can easily see that the problem has almost nothing to do with base load and everything to do with the rapid scaling up of peak load. This is why AC compressors are the culprit. They are fully automated, distributed, and they all kick on under shared environmental triggers. The starting up of ACs during a heatwave is literally almost equivalent to 100% of NYC base load.

    Shutting off a few 10s of MW for lighting cannot solve the problem.