About 3 weeks ago (well past the original reservation period) I decided I might as well put myself on the reservation list for the steam machine (512Gb + controller) and yesterday, I already received my notification that I am able to purchase the damn thing. I expected to wait way longer, at least until next year.
Are turnarounds this short to be expected?

  • marighost@piefed.social
    link
    fedilink
    English
    arrow-up
    3
    ·
    10 hours ago

    I entered the queue the day it was announced and I’m still waiting. I don’t actually want one (holding out for the Frame), but I had hoped to be a backup in case my friend couldn’t get one.

    He got his in a week and I’m still waiting. Lol