About 3 weeks ago (well past the original reservation period) I decided I might as well put myself on the reservation list for the steam machine (512Gb + controller) and yesterday, I already received my notification that I am able to purchase the damn thing. I expected to wait way longer, at least until next year.
Are turnarounds this short to be expected?

  • user_6282638282@sopuli.xyz
    link
    fedilink
    arrow-up
    1
    ·
    13 hours ago

    What region are you in?

    I’m annoyed that I originally picked that queue and then changed to just 512GB without controller. I did not get selected and am stuck on the waitlist and I can’t change without losing my spot, without any information about where that is. I’d literally buy any model available, although I understand why Valve doesn’t want to encourage queue-hopping.

    I imagine the bare 512GB is the longest queue.

    • Localhorst86@feddit.orgOP
      link
      fedilink
      arrow-up
      3
      ·
      12 hours ago

      I’m in germany. Entered my spot early in August, when a friend of mine got their list-spot for the 2TB+controller SKU.